RIPL Project Two

Post-occupancy built and technology design evaluation

Research output: Book/ReportCommissioned ReportResearch

Abstract

Interactive PDF report. Commissioned by the Institute for Safety, Compensation and Recovery Research (ISCRR).
Original languageEnglish
Place of PublicationMelbourne Vic Australia
PublisherInstitute for Safety, Compensation and Recovery Research
Number of pages156
Publication statusPublished - May 2016

Cite this

Tregloan, K., & Callaway, L. (2016). RIPL Project Two: Post-occupancy built and technology design evaluation. Melbourne Vic Australia: Institute for Safety, Compensation and Recovery Research.
Tregloan, Kate ; Callaway, Libby. / RIPL Project Two : Post-occupancy built and technology design evaluation. Melbourne Vic Australia : Institute for Safety, Compensation and Recovery Research, 2016. 156 p.
@book{3aa091fee38842508df9bd75771e66b3,
title = "RIPL Project Two: Post-occupancy built and technology design evaluation",
abstract = "Interactive PDF report. Commissioned by the Institute for Safety, Compensation and Recovery Research (ISCRR).",
author = "Kate Tregloan and Libby Callaway",
note = "Interactive PDF report. Commissioned bye the institute for Safety, Compensation and Recovery Research (ISCRR)",
year = "2016",
month = "5",
language = "English",
publisher = "Institute for Safety, Compensation and Recovery Research",

}

Tregloan, K & Callaway, L 2016, RIPL Project Two: Post-occupancy built and technology design evaluation. Institute for Safety, Compensation and Recovery Research, Melbourne Vic Australia.

RIPL Project Two : Post-occupancy built and technology design evaluation. / Tregloan, Kate; Callaway, Libby.

Melbourne Vic Australia : Institute for Safety, Compensation and Recovery Research, 2016. 156 p.

Research output: Book/ReportCommissioned ReportResearch

TY - BOOK

T1 - RIPL Project Two

T2 - Post-occupancy built and technology design evaluation

AU - Tregloan, Kate

AU - Callaway, Libby

N1 - Interactive PDF report. Commissioned bye the institute for Safety, Compensation and Recovery Research (ISCRR)

PY - 2016/5

Y1 - 2016/5

N2 - Interactive PDF report. Commissioned by the Institute for Safety, Compensation and Recovery Research (ISCRR).

AB - Interactive PDF report. Commissioned by the Institute for Safety, Compensation and Recovery Research (ISCRR).

M3 - Commissioned Report

BT - RIPL Project Two

PB - Institute for Safety, Compensation and Recovery Research

CY - Melbourne Vic Australia

ER -

Tregloan K, Callaway L. RIPL Project Two: Post-occupancy built and technology design evaluation. Melbourne Vic Australia: Institute for Safety, Compensation and Recovery Research, 2016. 156 p.