Abstract
Considering the characteristics of high-speed railway settlement requirement, i.e. high precision and strict control after construction, the subgrade settlement of the Wuhan-Guangzhou high-speed rail on the red clay area is calculated by ES method, e-lgp method, triaxial stress method, secant modulus method and field test method. In this essay, the accuracy of various calculation methods has been compared and corrected with the values from loading test. In this process, correction coefficients for various calculation methods have been obtained.
Original language | English |
---|---|
Title of host publication | International Conference on Vibration, Structural Engineering and Measurement 2012 |
Editors | Chunliang Zhang, Paul P Lin |
Place of Publication | Switzerland |
Publisher | Trans Tech Publications |
Pages | 1571 - 1576 |
Number of pages | 6 |
DOIs | |
Publication status | Published - 2012 |
Event | International Conference on Vibration, Structural Engineering and Measurement (ICVSEM) - Shanghai China, Switzerland Duration: 1 Jan 2012 → … |
Conference
Conference | International Conference on Vibration, Structural Engineering and Measurement (ICVSEM) |
---|---|
City | Switzerland |
Period | 1/01/12 → … |