Progress towards implementation of top-up at the Australian Synchrotron

G LeBlanc, P. Benetto, M. Boland, S. Costantin, R. Dowd, E. V. Garderen, Y. R E Tan, D. Zhu

Research output: Chapter in Book/Report/Conference proceedingConference PaperResearchpeer-review

Abstract

The Australian Synchrotron Light Source has enjoyed several years of stable operations with a high degree of availability. It is now time to move towards top-up operations to improve the stability and integrated flux of the photon beam. This paper describes the steps that have been taken and what remains to be done in order to implement top-up injection as the normal operation mode.

Original languageEnglish
Title of host publicationIPAC 2011 - 2nd International Particle Accelerator Conference
Pages2904-2906
Number of pages3
Publication statusPublished - 2011
Externally publishedYes
Event2nd International Particle Accelerator Conference - Kursaal, San Sebastian, Spain
Duration: 4 Sep 20119 Sep 2011
Conference number: 2

Conference

Conference2nd International Particle Accelerator Conference
Abbreviated titleIPAC 2011
CountrySpain
CityKursaal, San Sebastian
Period4/09/119/09/11

Cite this