Skip to main navigation Skip to search Skip to main content

Probabilistic critical path identification for cost-effective monitoring of service-based web applications

Research output: Chapter in Book/Report/Conference proceeding › Conference Paper › Other

Abstract

The critical path of a composite Web application operating in volatile environments, i.e., the execution path in the service composition with the maximum execution time, should be prioritised in cost-effective monitoring as it determines the response time of the Web application. In volatile operating environments, the critical path of a Web application is probabilistic. As such, it is important to estimate the criticalities of the execution paths, i.e., the probabilities that they are critical, to decide which parts of the system to monitor. We propose a novel approach to the identification of Probabilistic Critical Path for Service-based Web Applications (PCP-SWA), which calculates the criticalities of different execution paths in the context of service composition. We evaluate PCP-SWA experimentally using an example Web application. Compared to random monitoring, PCP-SWA based monitoring is 55.67% more cost-effective on average. Copyright is held by the author/owner(s).

Original languageEnglish
Title of host publicationWWW'12 - Proceedings of the 21st Annual Conference on World Wide Web Companion
PublisherAssociation for Computing Machinery (ACM)
Pages523-524
Number of pages2
ISBN (Print)9781450312301
DOIs
Publication statusPublished - 2012
Externally publishedYes
EventInternational World Wide Web Conference 2012 - Lyon, France
Duration: 16 Apr 2012 → 20 Apr 2012
Conference number: 21st
https://dl.acm.org/doi/proceedings/10.1145/2187836 (Proceedings)

Publication series

NameWWW'12 - Proceedings of the 21st Annual Conference on World Wide Web Companion

Conference

ConferenceInternational World Wide Web Conference 2012
Abbreviated titleWWW 2012
Country/TerritoryFrance
CityLyon
Period16/04/12 → 20/04/12
Internet address

Keywords

  • Critical path
  • Monitoring
  • Service composition
  • Web application
  • Web service

Cite this