Performance-based control of variability and tolerance in off-site manufacture and assembly: optimization of penalty on poor production quality

Mehrdad Arashpour, Amin Heidarpour, Ali Akbar Nezhad, Zahra Hosseinifard, Nicholas Chileshe, Reza Hosseini

Research output: Contribution to journalArticleResearchpeer-review

5 Citations (Scopus)

Abstract

Defects and quality problems in off-site manufacturing of building parts are caused by different variables. Subsequently, rework is required during on-site subassembly aggregation. Rework and tampering with prefabricated parts has implications including suboptimal structural/non-structural performance, delays and increased costs. Currently there is a gap in the off-site construction literature in developing effective interventions to reflect on variability in operations of subassembly manufacturers. On this basis, and in the first step of the current research, point clouds of the as-built status of parts are generated by laser scanners and compared with the as-designed status represented by Building Information models (BIM). Then, optimization modelling is used for development of a balanced penalty and incentive (PI) scheme to minimize variability. For this purpose, total expenditure on variability reduction is offset by revenues generated from penalties on poor quality. This optimization-based research contributes to the off-site construction literature by providing cost-effective solutions to quality problems. Furthermore, models and findings are of practical importance to off-site manufacturers by encouraging precision and discouraging discrepancy.

Original languageEnglish
Number of pages13
JournalConstruction Management and Economics
DOIs
Publication statusAccepted/In press - 5 Jun 2019

Keywords

  • Advanced manufacturing
  • construction project management
  • decision support systems
  • gaming behaviour
  • hypothesis testing

Cite this

@article{25690499cc27435a8780432166ae36ad,
title = "Performance-based control of variability and tolerance in off-site manufacture and assembly: optimization of penalty on poor production quality",
abstract = "Defects and quality problems in off-site manufacturing of building parts are caused by different variables. Subsequently, rework is required during on-site subassembly aggregation. Rework and tampering with prefabricated parts has implications including suboptimal structural/non-structural performance, delays and increased costs. Currently there is a gap in the off-site construction literature in developing effective interventions to reflect on variability in operations of subassembly manufacturers. On this basis, and in the first step of the current research, point clouds of the as-built status of parts are generated by laser scanners and compared with the as-designed status represented by Building Information models (BIM). Then, optimization modelling is used for development of a balanced penalty and incentive (PI) scheme to minimize variability. For this purpose, total expenditure on variability reduction is offset by revenues generated from penalties on poor quality. This optimization-based research contributes to the off-site construction literature by providing cost-effective solutions to quality problems. Furthermore, models and findings are of practical importance to off-site manufacturers by encouraging precision and discouraging discrepancy.",
keywords = "Advanced manufacturing, construction project management, decision support systems, gaming behaviour, hypothesis testing",
author = "Mehrdad Arashpour and Amin Heidarpour and {Akbar Nezhad}, Ali and Zahra Hosseinifard and Nicholas Chileshe and Reza Hosseini",
year = "2019",
month = "6",
day = "5",
doi = "10.1080/01446193.2019.1616789",
language = "English",
journal = "Construction Management and Economics",
issn = "0144-6193",
publisher = "Taylor & Francis",

}

Performance-based control of variability and tolerance in off-site manufacture and assembly : optimization of penalty on poor production quality. / Arashpour, Mehrdad; Heidarpour, Amin; Akbar Nezhad, Ali; Hosseinifard, Zahra; Chileshe, Nicholas; Hosseini, Reza.

In: Construction Management and Economics, 05.06.2019.

Research output: Contribution to journalArticleResearchpeer-review

TY - JOUR

T1 - Performance-based control of variability and tolerance in off-site manufacture and assembly

T2 - optimization of penalty on poor production quality

AU - Arashpour, Mehrdad

AU - Heidarpour, Amin

AU - Akbar Nezhad, Ali

AU - Hosseinifard, Zahra

AU - Chileshe, Nicholas

AU - Hosseini, Reza

PY - 2019/6/5

Y1 - 2019/6/5

N2 - Defects and quality problems in off-site manufacturing of building parts are caused by different variables. Subsequently, rework is required during on-site subassembly aggregation. Rework and tampering with prefabricated parts has implications including suboptimal structural/non-structural performance, delays and increased costs. Currently there is a gap in the off-site construction literature in developing effective interventions to reflect on variability in operations of subassembly manufacturers. On this basis, and in the first step of the current research, point clouds of the as-built status of parts are generated by laser scanners and compared with the as-designed status represented by Building Information models (BIM). Then, optimization modelling is used for development of a balanced penalty and incentive (PI) scheme to minimize variability. For this purpose, total expenditure on variability reduction is offset by revenues generated from penalties on poor quality. This optimization-based research contributes to the off-site construction literature by providing cost-effective solutions to quality problems. Furthermore, models and findings are of practical importance to off-site manufacturers by encouraging precision and discouraging discrepancy.

AB - Defects and quality problems in off-site manufacturing of building parts are caused by different variables. Subsequently, rework is required during on-site subassembly aggregation. Rework and tampering with prefabricated parts has implications including suboptimal structural/non-structural performance, delays and increased costs. Currently there is a gap in the off-site construction literature in developing effective interventions to reflect on variability in operations of subassembly manufacturers. On this basis, and in the first step of the current research, point clouds of the as-built status of parts are generated by laser scanners and compared with the as-designed status represented by Building Information models (BIM). Then, optimization modelling is used for development of a balanced penalty and incentive (PI) scheme to minimize variability. For this purpose, total expenditure on variability reduction is offset by revenues generated from penalties on poor quality. This optimization-based research contributes to the off-site construction literature by providing cost-effective solutions to quality problems. Furthermore, models and findings are of practical importance to off-site manufacturers by encouraging precision and discouraging discrepancy.

KW - Advanced manufacturing

KW - construction project management

KW - decision support systems

KW - gaming behaviour

KW - hypothesis testing

UR - http://www.scopus.com/inward/record.url?scp=85066983785&partnerID=8YFLogxK

U2 - 10.1080/01446193.2019.1616789

DO - 10.1080/01446193.2019.1616789

M3 - Article

AN - SCOPUS:85066983785

JO - Construction Management and Economics

JF - Construction Management and Economics

SN - 0144-6193

ER -