Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources

Mehrdad Arashpour, Ron Wakefield, Babak Abbasi, Mohammadreza Arashpour, Reza Hosseini

Research output: Contribution to journalArticleResearchpeer-review

Abstract

The architecture, engineering and construction industry has long dealt with problems such as schedule and budget overruns, quality and safety issues, and low productivity. Off-site construction, which is a hybrid of manufacturing and construction, has significant potential to address industry’s endemic problems. However, off-site construction has been criticized for replicating the traditional subcontracting approach and therefore fragmented practice in the construction industry. The current research focuses on process integration and cross-training of multi-skilled resources as a solution to the aforementioned problem. To identify optimal process integration architectures for off-site construction, production data of three off-site manufacturers were analyzed by using a hybrid of fuzzy theory and the technique for order of preference by similarity to ideal solution. Findings reveal that process integration architectures transferring excess capacity from under-utilized to over-utilized resources in direct or indirect pathways are preferable in terms of satisfying decision criteria such as time and cost of cross-training, skill transferability, compliance with network logic, and safety considerations. The study contributes to the off-site construction literature by providing insight into dynamics of using multi-skilled resources. It also contributes to practice by developing a customizable and user-friendly framework for off-site production managers in order to identify the optimal process integration architecture in their own production scenarios.

Original languageEnglish
Pages (from-to)46-59
Number of pages14
JournalArchitectural Engineering and Design Management
Volume14
Issue number1-2
DOIs
Publication statusPublished - 2018
Externally publishedYes

Cite this

Arashpour, Mehrdad ; Wakefield, Ron ; Abbasi, Babak ; Arashpour, Mohammadreza ; Hosseini, Reza. / Optimal process integration architectures in off-site construction : Theorizing the use of multi-skilled resources. In: Architectural Engineering and Design Management. 2018 ; Vol. 14, No. 1-2. pp. 46-59.
@article{2502ccd9344a4fabb1afc603129ea863,
title = "Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources",
abstract = "The architecture, engineering and construction industry has long dealt with problems such as schedule and budget overruns, quality and safety issues, and low productivity. Off-site construction, which is a hybrid of manufacturing and construction, has significant potential to address industry’s endemic problems. However, off-site construction has been criticized for replicating the traditional subcontracting approach and therefore fragmented practice in the construction industry. The current research focuses on process integration and cross-training of multi-skilled resources as a solution to the aforementioned problem. To identify optimal process integration architectures for off-site construction, production data of three off-site manufacturers were analyzed by using a hybrid of fuzzy theory and the technique for order of preference by similarity to ideal solution. Findings reveal that process integration architectures transferring excess capacity from under-utilized to over-utilized resources in direct or indirect pathways are preferable in terms of satisfying decision criteria such as time and cost of cross-training, skill transferability, compliance with network logic, and safety considerations. The study contributes to the off-site construction literature by providing insight into dynamics of using multi-skilled resources. It also contributes to practice by developing a customizable and user-friendly framework for off-site production managers in order to identify the optimal process integration architecture in their own production scenarios.",
author = "Mehrdad Arashpour and Ron Wakefield and Babak Abbasi and Mohammadreza Arashpour and Reza Hosseini",
year = "2018",
doi = "10.1080/17452007.2017.1302406",
language = "English",
volume = "14",
pages = "46--59",
journal = "Architectural Engineering and Design Management",
issn = "1745-2007",
publisher = "Taylor & Francis",
number = "1-2",

}

Optimal process integration architectures in off-site construction : Theorizing the use of multi-skilled resources. / Arashpour, Mehrdad; Wakefield, Ron; Abbasi, Babak; Arashpour, Mohammadreza; Hosseini, Reza.

In: Architectural Engineering and Design Management, Vol. 14, No. 1-2, 2018, p. 46-59.

Research output: Contribution to journalArticleResearchpeer-review

TY - JOUR

T1 - Optimal process integration architectures in off-site construction

T2 - Theorizing the use of multi-skilled resources

AU - Arashpour, Mehrdad

AU - Wakefield, Ron

AU - Abbasi, Babak

AU - Arashpour, Mohammadreza

AU - Hosseini, Reza

PY - 2018

Y1 - 2018

N2 - The architecture, engineering and construction industry has long dealt with problems such as schedule and budget overruns, quality and safety issues, and low productivity. Off-site construction, which is a hybrid of manufacturing and construction, has significant potential to address industry’s endemic problems. However, off-site construction has been criticized for replicating the traditional subcontracting approach and therefore fragmented practice in the construction industry. The current research focuses on process integration and cross-training of multi-skilled resources as a solution to the aforementioned problem. To identify optimal process integration architectures for off-site construction, production data of three off-site manufacturers were analyzed by using a hybrid of fuzzy theory and the technique for order of preference by similarity to ideal solution. Findings reveal that process integration architectures transferring excess capacity from under-utilized to over-utilized resources in direct or indirect pathways are preferable in terms of satisfying decision criteria such as time and cost of cross-training, skill transferability, compliance with network logic, and safety considerations. The study contributes to the off-site construction literature by providing insight into dynamics of using multi-skilled resources. It also contributes to practice by developing a customizable and user-friendly framework for off-site production managers in order to identify the optimal process integration architecture in their own production scenarios.

AB - The architecture, engineering and construction industry has long dealt with problems such as schedule and budget overruns, quality and safety issues, and low productivity. Off-site construction, which is a hybrid of manufacturing and construction, has significant potential to address industry’s endemic problems. However, off-site construction has been criticized for replicating the traditional subcontracting approach and therefore fragmented practice in the construction industry. The current research focuses on process integration and cross-training of multi-skilled resources as a solution to the aforementioned problem. To identify optimal process integration architectures for off-site construction, production data of three off-site manufacturers were analyzed by using a hybrid of fuzzy theory and the technique for order of preference by similarity to ideal solution. Findings reveal that process integration architectures transferring excess capacity from under-utilized to over-utilized resources in direct or indirect pathways are preferable in terms of satisfying decision criteria such as time and cost of cross-training, skill transferability, compliance with network logic, and safety considerations. The study contributes to the off-site construction literature by providing insight into dynamics of using multi-skilled resources. It also contributes to practice by developing a customizable and user-friendly framework for off-site production managers in order to identify the optimal process integration architecture in their own production scenarios.

UR - http://www.scopus.com/inward/record.url?scp=85015737856&partnerID=8YFLogxK

U2 - 10.1080/17452007.2017.1302406

DO - 10.1080/17452007.2017.1302406

M3 - Article

VL - 14

SP - 46

EP - 59

JO - Architectural Engineering and Design Management

JF - Architectural Engineering and Design Management

SN - 1745-2007

IS - 1-2

ER -