Abstract
A significant proportion of power transformers are approaching the end of their designed life. However, the Utilities are coming under increasing pressure to delay asset upgrade costs. Therefore, in order to determine whether delaying a replacement for a particular power transformer is safe the Utilities require tools to help them reach this decision.
| Original language | English |
|---|---|
| Title of host publication | 2013 Australasian Universities Power Engineering Conference (AUPEC 2013) |
| Subtitle of host publication | 29 September – 3 October, Hobart, Australia |
| Place of Publication | Piscataway, NJ |
| Publisher | IEEE, Institute of Electrical and Electronics Engineers |
| Pages | 1-6 |
| Number of pages | 6 |
| ISBN (Electronic) | 9781862959132 |
| ISBN (Print) | 9781479938759 |
| DOIs | |
| Publication status | Published - 2013 |
| Event | Australasian Universities Power Engineering Conference 2013 - Hobart, Australia Duration: 29 Sept 2013 → 3 Oct 2013 |
Conference
| Conference | Australasian Universities Power Engineering Conference 2013 |
|---|---|
| Abbreviated title | AUPEC 2013 |
| Country/Territory | Australia |
| City | Hobart |
| Period | 29/09/13 → 3/10/13 |
Keywords
- Dielectric Breakdown
- Oil insulation
- Paper products
- Transformers
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver