This article analyses the failure of a 500 mm-diameter cast iron (CI) water pipe that catastrophically fractured in Sydney in 2013. According to metallurgical analysis and finite element simulation, a longitudinal pre-existing crack initiated from the adjacent bell-joint and eventually propagated to a critical length in the pipe barrel over a certain period. There was evidence of leakage prior to the burst incident but information was inconclusive whether it was exactly from this pipe. Fatigue caused by cyclic internal pressure was considered as the predominant factor in leading to crack growth. A numerical model was developed to describe crack growth behaviour using Paris’ law, and metallurgical analysis and mechanical tests were conducted to support this investigation. Based on the field evidence and simulation results, the leak-before-break approach might be applicable in CI pipes to avoid severe consequences of trunk main bursts.

Original languageEnglish
Pages (from-to)487-494
Number of pages8
JournalWater Practice and Technology
Volume12
Issue number2
DOIs
Publication statusPublished - 1 Jun 2017

Keywords

  • Cast iron pipes
  • Crack growth mechanism
  • Failure analysis
  • Leak-before-break (LBB) window

Cite this

@article{0af335f2d17e4f8e98b15f1df7d75fdd,
title = "Leak-before-break in cast iron mains: A failure analysis of a catastrophic pipe burst on Harris Street, Sydney",
abstract = "This article analyses the failure of a 500 mm-diameter cast iron (CI) water pipe that catastrophically fractured in Sydney in 2013. According to metallurgical analysis and finite element simulation, a longitudinal pre-existing crack initiated from the adjacent bell-joint and eventually propagated to a critical length in the pipe barrel over a certain period. There was evidence of leakage prior to the burst incident but information was inconclusive whether it was exactly from this pipe. Fatigue caused by cyclic internal pressure was considered as the predominant factor in leading to crack growth. A numerical model was developed to describe crack growth behaviour using Paris’ law, and metallurgical analysis and mechanical tests were conducted to support this investigation. Based on the field evidence and simulation results, the leak-before-break approach might be applicable in CI pipes to avoid severe consequences of trunk main bursts.",
keywords = "Cast iron pipes, Crack growth mechanism, Failure analysis, Leak-before-break (LBB) window",
author = "R. Jiang and D. Robert and Hutchinson, {C. R.} and Zhao, {X. L.} and J. Kodikara",
year = "2017",
month = "6",
day = "1",
doi = "10.2166/wpt.2017.058",
language = "English",
volume = "12",
pages = "487--494",
journal = "Water Practice and Technology",
issn = "1751-231X",
publisher = "Iwa Publishing",
number = "2",

}

Leak-before-break in cast iron mains : A failure analysis of a catastrophic pipe burst on Harris Street, Sydney. / Jiang, R.; Robert, D.; Hutchinson, C. R.; Zhao, X. L.; Kodikara, J.

In: Water Practice and Technology, Vol. 12, No. 2, 01.06.2017, p. 487-494.

Research output: Contribution to journalArticleResearchpeer-review

TY - JOUR

T1 - Leak-before-break in cast iron mains

T2 - A failure analysis of a catastrophic pipe burst on Harris Street, Sydney

AU - Jiang, R.

AU - Robert, D.

AU - Hutchinson, C. R.

AU - Zhao, X. L.

AU - Kodikara, J.

PY - 2017/6/1

Y1 - 2017/6/1

N2 - This article analyses the failure of a 500 mm-diameter cast iron (CI) water pipe that catastrophically fractured in Sydney in 2013. According to metallurgical analysis and finite element simulation, a longitudinal pre-existing crack initiated from the adjacent bell-joint and eventually propagated to a critical length in the pipe barrel over a certain period. There was evidence of leakage prior to the burst incident but information was inconclusive whether it was exactly from this pipe. Fatigue caused by cyclic internal pressure was considered as the predominant factor in leading to crack growth. A numerical model was developed to describe crack growth behaviour using Paris’ law, and metallurgical analysis and mechanical tests were conducted to support this investigation. Based on the field evidence and simulation results, the leak-before-break approach might be applicable in CI pipes to avoid severe consequences of trunk main bursts.

AB - This article analyses the failure of a 500 mm-diameter cast iron (CI) water pipe that catastrophically fractured in Sydney in 2013. According to metallurgical analysis and finite element simulation, a longitudinal pre-existing crack initiated from the adjacent bell-joint and eventually propagated to a critical length in the pipe barrel over a certain period. There was evidence of leakage prior to the burst incident but information was inconclusive whether it was exactly from this pipe. Fatigue caused by cyclic internal pressure was considered as the predominant factor in leading to crack growth. A numerical model was developed to describe crack growth behaviour using Paris’ law, and metallurgical analysis and mechanical tests were conducted to support this investigation. Based on the field evidence and simulation results, the leak-before-break approach might be applicable in CI pipes to avoid severe consequences of trunk main bursts.

KW - Cast iron pipes

KW - Crack growth mechanism

KW - Failure analysis

KW - Leak-before-break (LBB) window

UR - http://www.scopus.com/inward/record.url?scp=85020730275&partnerID=8YFLogxK

U2 - 10.2166/wpt.2017.058

DO - 10.2166/wpt.2017.058

M3 - Article

VL - 12

SP - 487

EP - 494

JO - Water Practice and Technology

JF - Water Practice and Technology

SN - 1751-231X

IS - 2

ER -