TY - JOUR
T1 - Investigating cognitive load in energy network control rooms
T2 - recommendations for future designs
AU - Afzal, Umair
AU - Prouzeau, Arnaud
AU - Lawrence, Lee
AU - Dwyer, Tim
AU - Bichinepally, Saikiranrao
AU - Liebman, Ariel
AU - Goodwin, Sarah
N1 - Funding Information:
This study was funded and supported by Australian Energy market Operator (AEMO).
Funding Information:
We acknowledge Australian Energy Market Operator (AEMO) which funded and enabled the study in the control room. We thank the operators who participated in this study.
Publisher Copyright:
Copyright © 2022 Afzal, Prouzeau, Lawrence, Dwyer, Bichinepally, Liebman and Goodwin.
PY - 2022/3/28
Y1 - 2022/3/28
N2 - This study analyzed and explored the cognitive load of Australian energy market operators managing one of the longest inter-connected electrical networks in the world. Each operator uses a workstation with seven screens in an active control room environment, with a large coordination screen to show information and enable collaboration between different control centers. Cognitive load was assessed during both training scenarios and regular control room operations via the integration of subjective and physiological measures. Eye-tracking glasses were also used to analyze the operators gaze behavior. Our results indicate that different events (normal or unexpected), different participants for the same session, and different periods of one session all have varying degrees of cognitive load. The system design was observed to be inefficient in some situations and to have an adverse affect on cognitive load. In critical situations for instance, operator collaboration was high and the coordination screen was used heavily when collaborating between two control centers, yet integration with the system could be improved. Eye tracking data analysis showed that the layout of applications across the seven screens was not optimal for many tasks. Improved layout strategies, potential combination of applications, redesigning of certain applications, and linked views are all recommended for further exploration in addition to improved integration of procedures and linking alarms to visual cues.
AB - This study analyzed and explored the cognitive load of Australian energy market operators managing one of the longest inter-connected electrical networks in the world. Each operator uses a workstation with seven screens in an active control room environment, with a large coordination screen to show information and enable collaboration between different control centers. Cognitive load was assessed during both training scenarios and regular control room operations via the integration of subjective and physiological measures. Eye-tracking glasses were also used to analyze the operators gaze behavior. Our results indicate that different events (normal or unexpected), different participants for the same session, and different periods of one session all have varying degrees of cognitive load. The system design was observed to be inefficient in some situations and to have an adverse affect on cognitive load. In critical situations for instance, operator collaboration was high and the coordination screen was used heavily when collaborating between two control centers, yet integration with the system could be improved. Eye tracking data analysis showed that the layout of applications across the seven screens was not optimal for many tasks. Improved layout strategies, potential combination of applications, redesigning of certain applications, and linked views are all recommended for further exploration in addition to improved integration of procedures and linking alarms to visual cues.
KW - cognitive load
KW - control room
KW - energy market operators
KW - eye tracking
KW - situational awareness
UR - https://www.scopus.com/pages/publications/85128421253
U2 - 10.3389/fpsyg.2022.812677
DO - 10.3389/fpsyg.2022.812677
M3 - Article
C2 - 35418923
AN - SCOPUS:85128421253
SN - 1664-1078
VL - 13
JO - Frontiers in Psychology
JF - Frontiers in Psychology
M1 - 812677
ER -