Fuzzy project scheduling with multiple objectives

Hongqi Pan, Chung Hsing Yeh

    Research output: Contribution to journalConference articleResearchpeer-review

    2 Citations (Scopus)

    Abstract

    Due to two-page limitations for being accepted as a poster paper, the paper can only briefly describe a hybrid fuzzy goal programming approach for solving multiple objectives in fuzzy multi-mode project scheduling. To simplify such complex scheduling, a rule knowledge base for mode assignment combines into fuzzy goal programming, thus a multi-mode scheduling problem is decomposed into a simpler single mode scheduling problem.

    Original languageEnglish
    Pages (from-to)1011-1012
    Number of pages2
    JournalLecture Notes in Artificial Intelligence (Subseries of Lecture Notes in Computer Science)
    Volume3157
    Publication statusPublished - 1 Dec 2004
    Event8th Pacific Rim International Conference on Artificial Intelligence, PRICAI 2004: Trends in Artificial Intelligence - Auckland, New Zealand
    Duration: 9 Aug 200413 Aug 2004

    Cite this