Exact and heuristic methods for the resource-constrained net present value problem

Hanyu Gu, Andreas Schutt, Peter James Stuckey, Mark G Wallace, Geoffrey Chu

    Research output: Chapter in Book/Report/Conference proceedingChapter (Book)Researchpeer-review

    Original languageEnglish
    Title of host publicationHandbook of Project Management and Scheduling Vol. 1
    EditorsChristoph Schwindt, Jurgen Zimmermann
    Place of PublicationCham Switzerland
    PublisherSpringer
    Pages299 - 318
    Number of pages20
    ISBN (Print)9783319054421
    DOIs
    Publication statusPublished - 2015

    Cite this

    Gu, H., Schutt, A., Stuckey, P. J., Wallace, M. G., & Chu, G. (2015). Exact and heuristic methods for the resource-constrained net present value problem. In C. Schwindt, & J. Zimmermann (Eds.), Handbook of Project Management and Scheduling Vol. 1 (pp. 299 - 318). Cham Switzerland: Springer. https://doi.org/10.1007/978-3-319-05443-8_14
    Gu, Hanyu ; Schutt, Andreas ; Stuckey, Peter James ; Wallace, Mark G ; Chu, Geoffrey. / Exact and heuristic methods for the resource-constrained net present value problem. Handbook of Project Management and Scheduling Vol. 1. editor / Christoph Schwindt ; Jurgen Zimmermann. Cham Switzerland : Springer, 2015. pp. 299 - 318
    @inbook{c12c3dffb84f464b9d683c9d8810da0b,
    title = "Exact and heuristic methods for the resource-constrained net present value problem",
    author = "Hanyu Gu and Andreas Schutt and Stuckey, {Peter James} and Wallace, {Mark G} and Geoffrey Chu",
    year = "2015",
    doi = "10.1007/978-3-319-05443-8_14",
    language = "English",
    isbn = "9783319054421",
    pages = "299 -- 318",
    editor = "Christoph Schwindt and Jurgen Zimmermann",
    booktitle = "Handbook of Project Management and Scheduling Vol. 1",
    publisher = "Springer",

    }

    Gu, H, Schutt, A, Stuckey, PJ, Wallace, MG & Chu, G 2015, Exact and heuristic methods for the resource-constrained net present value problem. in C Schwindt & J Zimmermann (eds), Handbook of Project Management and Scheduling Vol. 1. Springer, Cham Switzerland, pp. 299 - 318. https://doi.org/10.1007/978-3-319-05443-8_14

    Exact and heuristic methods for the resource-constrained net present value problem. / Gu, Hanyu; Schutt, Andreas; Stuckey, Peter James; Wallace, Mark G; Chu, Geoffrey.

    Handbook of Project Management and Scheduling Vol. 1. ed. / Christoph Schwindt; Jurgen Zimmermann. Cham Switzerland : Springer, 2015. p. 299 - 318.

    Research output: Chapter in Book/Report/Conference proceedingChapter (Book)Researchpeer-review

    TY - CHAP

    T1 - Exact and heuristic methods for the resource-constrained net present value problem

    AU - Gu, Hanyu

    AU - Schutt, Andreas

    AU - Stuckey, Peter James

    AU - Wallace, Mark G

    AU - Chu, Geoffrey

    PY - 2015

    Y1 - 2015

    UR - http://link.springer.com/content/pdf/10.1007%2F978-3-319-05443-8_14.pdf

    U2 - 10.1007/978-3-319-05443-8_14

    DO - 10.1007/978-3-319-05443-8_14

    M3 - Chapter (Book)

    SN - 9783319054421

    SP - 299

    EP - 318

    BT - Handbook of Project Management and Scheduling Vol. 1

    A2 - Schwindt, Christoph

    A2 - Zimmermann, Jurgen

    PB - Springer

    CY - Cham Switzerland

    ER -

    Gu H, Schutt A, Stuckey PJ, Wallace MG, Chu G. Exact and heuristic methods for the resource-constrained net present value problem. In Schwindt C, Zimmermann J, editors, Handbook of Project Management and Scheduling Vol. 1. Cham Switzerland: Springer. 2015. p. 299 - 318 https://doi.org/10.1007/978-3-319-05443-8_14