Problems in existing methods of production tracking in off-site construction result in schedule delays and increased costs. To eliminate these deficiencies, an autonomous production tracking that analyzes real-time production data is proposed. A specific implementation of the proposed production tracking mechanisms has been developed for a large off-site construction plant in Australia, and is in the process of installation. The paper shows that: (i) The production model in off-site construction is always nonlinear in the outcome due to the presence of variability (ii) in systems with a periodic production target, deviation from the schedule converges to zero at the end of production period and the same downward trend should be followed in designing plan buffers and (iii) long-term production performance in off-site construction can autonomously be monitored and controlled by observing critical variables of production. The paper provides those who manage off-site construction with recommendations on effective production tracking and management. The models and propositions in this research are of practical value and can be used to detect impending production shortfalls against periodic targets in the short-term, and adjust capacity parameters and production targets in long-term planning.

Original languageEnglish
Pages (from-to)13-21
Number of pages9
JournalAutomation in Construction
Volume53
DOIs
Publication statusPublished - 1 May 2015
Externally publishedYes

Keywords

  • Autonomous control
  • Construction management
  • Flexible capacity
  • Lean production
  • Off-site construction
  • Production planning
  • Simulation
  • Workflow

Cite this

Arashpour, Mehrdad ; Wakefield, Ron ; Blismas, Nick ; Maqsood, Tayyab. / Autonomous production tracking for augmenting output in off-site construction. In: Automation in Construction. 2015 ; Vol. 53. pp. 13-21.
@article{cd59dd59f43943249530c1c7007102e1,
title = "Autonomous production tracking for augmenting output in off-site construction",
abstract = "Problems in existing methods of production tracking in off-site construction result in schedule delays and increased costs. To eliminate these deficiencies, an autonomous production tracking that analyzes real-time production data is proposed. A specific implementation of the proposed production tracking mechanisms has been developed for a large off-site construction plant in Australia, and is in the process of installation. The paper shows that: (i) The production model in off-site construction is always nonlinear in the outcome due to the presence of variability (ii) in systems with a periodic production target, deviation from the schedule converges to zero at the end of production period and the same downward trend should be followed in designing plan buffers and (iii) long-term production performance in off-site construction can autonomously be monitored and controlled by observing critical variables of production. The paper provides those who manage off-site construction with recommendations on effective production tracking and management. The models and propositions in this research are of practical value and can be used to detect impending production shortfalls against periodic targets in the short-term, and adjust capacity parameters and production targets in long-term planning.",
keywords = "Autonomous control, Construction management, Flexible capacity, Lean production, Off-site construction, Production planning, Simulation, Workflow",
author = "Mehrdad Arashpour and Ron Wakefield and Nick Blismas and Tayyab Maqsood",
year = "2015",
month = "5",
day = "1",
doi = "10.1016/j.autcon.2015.03.013",
language = "English",
volume = "53",
pages = "13--21",
journal = "Automation in Construction",
issn = "0926-5805",
publisher = "Elsevier",

}

Autonomous production tracking for augmenting output in off-site construction. / Arashpour, Mehrdad; Wakefield, Ron; Blismas, Nick; Maqsood, Tayyab.

In: Automation in Construction, Vol. 53, 01.05.2015, p. 13-21.

Research output: Contribution to journalArticleResearchpeer-review

TY - JOUR

T1 - Autonomous production tracking for augmenting output in off-site construction

AU - Arashpour, Mehrdad

AU - Wakefield, Ron

AU - Blismas, Nick

AU - Maqsood, Tayyab

PY - 2015/5/1

Y1 - 2015/5/1

N2 - Problems in existing methods of production tracking in off-site construction result in schedule delays and increased costs. To eliminate these deficiencies, an autonomous production tracking that analyzes real-time production data is proposed. A specific implementation of the proposed production tracking mechanisms has been developed for a large off-site construction plant in Australia, and is in the process of installation. The paper shows that: (i) The production model in off-site construction is always nonlinear in the outcome due to the presence of variability (ii) in systems with a periodic production target, deviation from the schedule converges to zero at the end of production period and the same downward trend should be followed in designing plan buffers and (iii) long-term production performance in off-site construction can autonomously be monitored and controlled by observing critical variables of production. The paper provides those who manage off-site construction with recommendations on effective production tracking and management. The models and propositions in this research are of practical value and can be used to detect impending production shortfalls against periodic targets in the short-term, and adjust capacity parameters and production targets in long-term planning.

AB - Problems in existing methods of production tracking in off-site construction result in schedule delays and increased costs. To eliminate these deficiencies, an autonomous production tracking that analyzes real-time production data is proposed. A specific implementation of the proposed production tracking mechanisms has been developed for a large off-site construction plant in Australia, and is in the process of installation. The paper shows that: (i) The production model in off-site construction is always nonlinear in the outcome due to the presence of variability (ii) in systems with a periodic production target, deviation from the schedule converges to zero at the end of production period and the same downward trend should be followed in designing plan buffers and (iii) long-term production performance in off-site construction can autonomously be monitored and controlled by observing critical variables of production. The paper provides those who manage off-site construction with recommendations on effective production tracking and management. The models and propositions in this research are of practical value and can be used to detect impending production shortfalls against periodic targets in the short-term, and adjust capacity parameters and production targets in long-term planning.

KW - Autonomous control

KW - Construction management

KW - Flexible capacity

KW - Lean production

KW - Off-site construction

KW - Production planning

KW - Simulation

KW - Workflow

UR - http://www.scopus.com/inward/record.url?scp=84925011261&partnerID=8YFLogxK

U2 - 10.1016/j.autcon.2015.03.013

DO - 10.1016/j.autcon.2015.03.013

M3 - Article

VL - 53

SP - 13

EP - 21

JO - Automation in Construction

JF - Automation in Construction

SN - 0926-5805

ER -