Project Details
Status | Finished |
---|---|
Effective start/end date | 1/07/04 → 27/01/07 |
Funding
- Australian Institute of Nuclear Science and Engineering (AINSE): AUD13,000.00
- Australian Institute of Nuclear Science and Engineering (AINSE): AUD13,000.00
- Australian Institute of Nuclear Science and Engineering (AINSE): AUD7,580.00