Project Details
Project Description
The research has two stages:
Stage 1: Perform analysis and interpretation of existing passive seismic data acquired by Rio; 8 sites. Proposed cost $16,000
Stage 2: Provide advice and interpretation for further observations, and conduct technology transfer of software and skills for the interpretation process as developed for the unique charateristics of the iron ore deposits of the Hammersley area. Cost not yet discussed.
Stage 1: Perform analysis and interpretation of existing passive seismic data acquired by Rio; 8 sites. Proposed cost $16,000
Stage 2: Provide advice and interpretation for further observations, and conduct technology transfer of software and skills for the interpretation process as developed for the unique charateristics of the iron ore deposits of the Hammersley area. Cost not yet discussed.
Short title | Passive seismic iron ore |
---|---|
Acronym | PIO |
Status | Finished |
Effective start/end date | 1/03/18 → 30/06/19 |