Project Details
Project Description
Continuation of current ongoing R and D program for Draglines DRE27 and DRE28 and the ongoing monitoring and analysis and reporting to Maximizing Productivity, Managing Risk of Failure and Extending Asset Life of Structure Well Beyond Design Life Utilising Structural Monitoring System Data and Developing Predictive Analytical Models for the Dragline Fleet at Stanmore Resources Ltd
Short title | Maximizing Productivity, Managing Risk of Failure and Extending Asset Life |
---|---|
Status | Finished |
Effective start/end date | 10/05/21 → 10/05/23 |
Keywords
- Maximizing Productivity, Managing Risk of Failure and Extending Asset Life