Level 2 Condition Assessment Report WMBK04 Water Main

Project: Research

Project Details

Project Description

The Monash Infrastructure Doctors (MID) group led by Prof. Jayantha Kodikara is engaged in a contract research to provide analytical services to Sydney Water with the objective of predicting remaining functional asset life of water mains owned and/or maintained by Sydney Water. This is defined in the Master Agreement Contract with PURE ID 289618039. As part of this Master Agreement, the MID will be conducting research on as-received pipe dataset. The current PURE application is the analytical services conducted by the MID on a water pipeline belonging to Sydney Water. The analysed length of the water pipeline was about 5.4 km long. The outcome from this project is a report titled Level 2 Condition Assessment Report WMBK04 Water Main, which has been submitted to Sydney Water. The current PURE application is a claim for the work conducted and accompanying this document is the Monash cost model.
Short titleWMBK04/L2
StatusFinished
Effective start/end date1/01/2031/12/23

Funding

  • Sydney Water Corporation (New South Wales): A$24,086.00

Keywords

  • condition assessment
  • remaining life
  • data analysis
  • water pipeline