Project Details
Project Description
The Monash Infrastructure Doctors (MID) group led by Prof. Jayantha Kodikara is engaged in a contract research to provide analytical services to Sydney Water with the objective of predicting remaining functional asset life of water mains owned and/or maintained by Sydney Water. This is defined in the Master Agreement Contract with PURE ID 289618039. As part of this Master Agreement, the MID will be conducting research on as-received pipe dataset. The current PURE application is the analytical services conducted by the MID on a water pipeline belonging to Sydney Water. The analysed length of the water pipeline was about 5.4 km long. The outcome from this project is a report titled Level 2 Condition Assessment Report WMBK04 Water Main, which has been submitted to Sydney Water. The current PURE application is a claim for the work conducted and accompanying this document is the Monash cost model.
| Short title | WMBK04/L2 |
|---|---|
| Status | Finished |
| Effective start/end date | 1/01/20 → 31/12/23 |
Funding
- Sydney Water Corporation (New South Wales): A$24,086.00
Keywords
- condition assessment
- remaining life
- data analysis
- water pipeline