Project Details
Project Description
The Monash Infrastructure Doctors (MID) group led by Prof. Jayantha Kodikara is engaged in a contract research to provide analytical services to Sydney Water with the objective of predicting remaining functional asset life of water mains owned and/or maintained by Sydney Water. This is defined in the Master Agreement Contract with PURE ID 289618039. As part of this Master Agreement, the MID will be conducting research on as-received pipe dataset. The current PURE application is for the analytical services conducted by the MID on a water pipeline belonging to Sydney Water. The analysed length of the water pipeline was 2.12 km long. The outcome from this project is a report titled Level 1 Condition Assessment Report WMWA00 Water Main, which has been submitted to Sydney Water. The current PURE application is a claim for the work conducted and accompanying this document is the Monash cost model.
Short title | WMWA00 |
---|---|
Status | Finished |
Effective start/end date | 1/01/20 → 1/01/23 |
Keywords
- condition assessment
- remaining life
- data analysis
- water pipeline