Evaluation of the effectiveness of the 40km/h speed limit program for strip shopping centres

Project: Research

Project Description

The proposed project will assess the effectiveness of the 40km/h speed limit reduction at strip shopping centre treatments across all 48 sites at which the treatment has been implemented to date. This includes the 18 sites of the first trial, 24 sites of the SRIP3 and 6 sites of the SSRIP.
StatusFinished
Effective start/end date1/02/1730/06/17