Evaluating the effectiveness of Riparian Zone restoration in the streams of the Murray-Darling Basin

  • Lake, Philip (Primary Chief Investigator (PCI))
  • Cavagnaro, Timothy (Chief Investigator (CI))
  • Ladson, Tony (Chief Investigator (CI))
  • Quinn, Gerald (Chief Investigator (CI))
  • Reich, Paul (Chief Investigator (CI))

Project: Research

Project Details

StatusFinished
Effective start/end date1/11/0330/06/11

Funding

  • Murray-Darling Basin Authority (MDBA) (Australia): A$400,000.00
  • Murray-Darling Basin Authority (MDBA) (Australia): A$696,603.00
  • Murray-Darling Basin Authority (MDBA) (Australia): A$887,362.00