Project Details
Project Description
To provide guidance on parameter changes that will improve the performance of the existing Dynamic Tolling Algorithm (DTA) and increase revenues.
Acronym | DTA |
---|---|
Status | Finished |
Effective start/end date | 30/11/18 → 8/02/19 |
Funding
- Transurban Limited (trading as Transurban Linkt): A$31,357.80