Project Details
Project Description
The client, Georges Riverkeeper, wishes to confirm that the GPT strategy adopted is actually delivering the desired outcomes and would like to find further improvements. The Head Contractor for this project is Optimal Stormwater, who subcontracted a part of the project to WSCA. This project aims to develop a framework and a robust conceptual model to inform the auditing process, specification, assessment and selection of GPTs and other appropriate measures for the Georges River catchments.
Status | Finished |
---|---|
Effective start/end date | 15/06/22 → 30/09/22 |