Project Details
Status | Active |
---|---|
Effective start/end date | 3/03/25 → 2/03/28 |
Equipment
-
Australian Synchrotron
Office of the Vice-Provost (Research and Research Infrastructure)Facility/equipment: Facility
-
Centre for Additive Manufacturing (MCAM)
Aijun Huang (Manager)
Materials Science & EngineeringFacility/equipment: Facility
-
Centre for Electron Microscopy (MCEM)
Flame Sorrell (Manager) & Peter Miller (Manager)
Office of the Vice-Provost (Research and Research Infrastructure)Facility/equipment: Facility