Mehrdad Arashpour

Dr

  • 23 College Walk, Building 60

    Post Code: 3800 Melbourne

    Australia

20102020
If you made any changes in Pure these will be visible here soon.

Research Output 2010 2020

Filter
Article
2020
1 Citation (Scopus)

Predicting the compressive strength of normal and High-Performance Concretes using ANN and ANFIS hybridized with Grey Wolf Optimizer

Golafshani, E. M., Behnood, A. & Arashpour, M., 30 Jan 2020, In : Construction and Building Materials. 232, 14 p., 117266.

Research output: Contribution to journalArticleResearchpeer-review

2019

A simulation model for investigation of operation of elevator’s up-peak

Xiang, S., Arashpour, M. & Wakefield, R., 26 Apr 2019, (Accepted/In press) In : Journal of Simulation. 10 p.

Research output: Contribution to journalArticleResearchpeer-review

Barriers to the use of integrated project delivery (IPD): a quantified model for Malaysia

Durdyev, S., Hosseini, M. R., Martek, I., Ismail, S. & Arashpour, M., 22 Jul 2019, (Accepted/In press) In : Engineering, Construction and Architectural Management. 20 p.

Research output: Contribution to journalArticleResearchpeer-review

3 Citations (Scopus)

Critical Literature Review of Labor Multiskilling in Construction

Nasirian, A., Arashpour, M. & Abbasi, B., 1 Jan 2019, In : Journal of Construction Engineering and Management. 145, 1, 13 p., 04018113.

Research output: Contribution to journalArticleResearchpeer-review

Lean design management using a gamified system

Khanzadi, M., Shahbazi, M. M., Arashpour, M. & Ghosh, S., 1 Jan 2019, In : Scientia Iranica. 26, 1, p. 15-25 11 p.

Research output: Contribution to journalArticleResearchpeer-review

Lean methodologies and techniques for modular construction: chronological and critical review

Innella, F., Arashpour, M. & Bai, Y., Dec 2019, In : Journal of Construction Engineering and Management. 145, 12, 18 p., 04019076.

Research output: Contribution to journalArticleOtherpeer-review

3 Citations (Scopus)

Optimal work assignment to multiskilled resources in prefabricated construction

Nasirian, A., Arashpour, M., Abbasi, B. & Akbarnezhad, A., 1 Apr 2019, In : Journal of Construction Engineering and Management. 145, 4, 11 p., 1627.

Research output: Contribution to journalArticleResearchpeer-review

3 Citations (Scopus)

Performance-based control of variability and tolerance in off-site manufacture and assembly: optimization of penalty on poor production quality

Arashpour, M., Heidarpour, A., Akbar Nezhad, A., Hosseinifard, Z., Chileshe, N. & Hosseini, R., 5 Jun 2019, (Accepted/In press) In : Construction Management and Economics. 13 p.

Research output: Contribution to journalArticleResearchpeer-review

Skill set configuration in prefabricated construction: hybrid optimization and multicriteria decision-making approach

Nasirian, A., Arashpour, M., Abbasi, B., Zavadskas, E. K. & Akbarnezhad, A., 1 Sep 2019, In : Journal of Construction Engineering and Management. 145, 9, 16 p., 04019050.

Research output: Contribution to journalArticleResearchpeer-review

The less agents, the more schedule reliability: examination of single-point responsibility model in design management

Khanzadi, M., Shahbazi, M. M., Arashpour, M. & Ghosh, S., 1 Aug 2019, In : International Journal of Civil Engineering. 17, 8, p. 1307-1316 10 p.

Research output: Contribution to journalArticleResearchpeer-review

2018
15 Citations (Scopus)

Analysis of Citation Networks in Building Information Modeling Research

Hosseini, M. R., Maghrebi, M., Akbarnezhad, A., Martek, I. & Arashpour, M., 1 Aug 2018, In : Journal of Construction Engineering and Management. 144, 8, 13 p., 04018064.

Research output: Contribution to journalArticleResearchpeer-review

Open Access
File
2 Citations (Scopus)

A qualitative investigation of perceived impacts of virtuality on effectiveness of hybrid construction project teams

Hosseini, M. R., Bosch-Sijtsema, P., Arashpour, M., Chileshe, N. & Merschbrock, C., 2018, In : Construction Innovation: Information, Process, Management. 18, 1, p. 109-131 23 p.

Research output: Contribution to journalArticleResearchpeer-review

3 Citations (Scopus)

Assessing the Influence of Virtuality on the Effectiveness of Engineering Project Networks: "Big Five Theory" Perspective

Hosseini, M. R., Martek, I., Chileshe, N., Zavadskas, E. K. & Arashpour, M., 1 Jul 2018, In : Journal of Construction Engineering and Management. 144, 7, 12 p., 04018059.

Research output: Contribution to journalArticleResearchpeer-review

Open Access
File
8 Citations (Scopus)

Collaborative role of sociotechnical components in bim-based construction networks in two hospitals

Merschbrock, C., Hosseini, M. R., Martek, I., Arashpour, M. & Mignone, G., 1 Jul 2018, In : Journal of Management in Engineering. 34, 4, 11 p., 05018006.

Research output: Contribution to journalArticleResearchpeer-review

19 Citations (Scopus)

Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources

Arashpour, M., Wakefield, R., Abbasi, B., Arashpour, M. & Hosseini, R., 2018, In : Architectural Engineering and Design Management. 14, 1-2, p. 46-59 14 p.

Research output: Contribution to journalArticleResearchpeer-review

12 Citations (Scopus)

Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction

Arashpour, M., Kamat, V., Bai, Y., Wakefield, R. & Abbasi, B., 1 Nov 2018, In : Automation in Construction. 95, p. 1-9 9 p.

Research output: Contribution to journalArticleResearchpeer-review

2 Citations (Scopus)

The evolution of stakeholder management practices in Australian mega construction projects

Yang, R. J., Jayasuriya, S., Gunarathna, C., Arashpour, M., Xue, X. & Zhang, G., 16 Jul 2018, In : Engineering Construction and Architectural Management. 25, 6, p. 690-706 17 p.

Research output: Contribution to journalArticleResearchpeer-review

4 Citations (Scopus)

Viability of the BIM Manager Enduring as a Distinct Role: Association Rule Mining of Job Advertisements

Hosseini, M. R., Martek, I., Papadonikolaki, E., Sheikhkhoshkar, M., Banihashemi, S. & Arashpour, M., 1 Sep 2018, In : Journal of Construction Engineering and Management. 144, 9, 11 p., 04018085.

Research output: Contribution to journalArticleResearchpeer-review

Open Access
File
2017
10 Citations (Scopus)

An integrated model for factors affecting construction and demolition waste management in Iran

Nikmehr, B., Hosseini, M. R., Rameezdeen, R., Chileshe, N., Ghoddousi, P. & Arashpour, M., 2017, In : Engineering Construction and Architectural Management. 24, 6, p. 1246-1268 23 p.

Research output: Contribution to journalArticleResearchpeer-review

52 Citations (Scopus)

Collaboration in BIM-based construction networks: a bibliometric-qualitative literature review

Oraee, M., Hosseini, M. R., Papadonikolaki, E., Palliyaguru, R. & Arashpour, M., 1 Oct 2017, In : International Journal of Project Management. 35, 7, p. 1288-1301 14 p.

Research output: Contribution to journalArticleResearchpeer-review

24 Citations (Scopus)

Integrated management of on-site, coordination and off-site uncertainty: theorizing risk analysis within a hybrid project setting

Arashpour, M., Abbasi, B., Arashpour, M., Reza Hosseini, M. & Yang, R., 1 May 2017, In : International Journal of Project Management. 35, 4, p. 647-655 9 p.

Research output: Contribution to journalArticleResearchpeer-review

20 Citations (Scopus)

Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction

Arashpour, M., Bai, Y., Aranda-mena, G., Bab-Hadiashar, A., Hosseini, R. & Kalutara, P., 1 Dec 2017, In : Automation in Construction. 84, p. 146-153 8 p.

Research output: Contribution to journalArticleResearchpeer-review

9 Citations (Scopus)

Sustainability by Information and Communication Technology: a paradigm shift for construction projects in Iran

Hosseini, M. R., Banihashemi, S., Rameezdeen, R., Golizadeh, H., Arashpour, M. & Ma, L., 1 Dec 2017, In : Journal of Cleaner Production. 168, p. 1-13 13 p.

Research output: Contribution to journalArticleResearchpeer-review

2016
37 Citations (Scopus)

Analysis of interacting uncertainties in on-site and off-site activities: implications for hybrid construction

Arashpour, M., Wakefield, R., Lee, E. W. M., Chan, R. & Hosseini, M. R., 1 Oct 2016, In : International Journal of Project Management. 34, 7, p. 1393-1402 10 p.

Research output: Contribution to journalArticleResearchpeer-review

10 Citations (Scopus)

Critical success factors for implementing risk management systems in developing countries

Reza Hosseini, M., Chileshe, N., Jepson, J. & Arashpour, M., 2016, In : Construction Economics and Building. 16, 1, p. 18-32 15 p.

Research output: Contribution to journalArticleResearchpeer-review

Open Access
File
29 Citations (Scopus)

Enhancing collaboration in BIM-based construction networks through organisational discontinuity theory: a case study of the new Royal Adelaide Hospital

Mignone, G., Hosseini, M. R., Chileshe, N. & Arashpour, M., 2 Sep 2016, In : Architectural Engineering and Design Management. 12, 5, p. 333-352 20 p.

Research output: Contribution to journalArticleResearchpeer-review

39 Citations (Scopus)

Off-site construction optimization: sequencing multiple job classes with time constraints

Arashpour, M., Wakefield, R., Abbasi, B., Lee, E. W. M. & Minas, J., 1 Nov 2016, In : Automation in Construction. 71, Part 2, p. 262-270 9 p.

Research output: Contribution to journalArticleResearchpeer-review

19 Citations (Scopus)

Quantitative analysis of rate-driven and due date-driven construction: production efficiency, supervision, and controllability in residential projects

Arashpour, M., Wakefield, R., Blismas, N. & Abbasi, B., 1 Jan 2016, In : Journal of Construction Engineering and Management. 142, 1, 11 p., 05015012.

Research output: Contribution to journalArticleResearchpeer-review

2015
38 Citations (Scopus)

Analysis of workflow variability and its impacts on productivity and performance in construction of multistory buildings

Arashpour, M. & Arashpour, M., 1 Nov 2015, In : Journal of Management in Engineering. 31, 6, 9 p., 04015006.

Research output: Contribution to journalArticleResearchpeer-review

14 Citations (Scopus)

Application of Nonlinear-Autoregressive-Exogenous model to predict the hysteretic behaviour of passive control systems

Chan, R. W. K., Yuen, J. K. K., Lee, E. W. M. & Arashpour, M., 15 Feb 2015, In : Engineering Structures. 85, p. 1-10 10 p.

Research output: Contribution to journalArticleResearchpeer-review

26 Citations (Scopus)

Autonomous production tracking for augmenting output in off-site construction

Arashpour, M., Wakefield, R., Blismas, N. & Maqsood, T., 1 May 2015, In : Automation in Construction. 53, p. 13-21 9 p.

Research output: Contribution to journalArticleResearchpeer-review

45 Citations (Scopus)

Optimization of process integration and multi-skilled resource utilization in off-site construction

Arashpour, M., Wakefield, R., Blismas, N. & Minas, J., 1 Feb 2015, In : Automation in Construction. 50, p. 72-80 9 p.

Research output: Contribution to journalArticleResearchpeer-review

2014
6 Citations (Scopus)

A fully autonomous kernel-based online learning neural network model and its application to building cooling load prediction

Lee, E. W. M., Fung, I. W. H., Tam, V. W. Y. & Arashpour, M., 1 Oct 2014, In : Soft Computing. 18, 10, p. 1999-2014 16 p.

Research output: Contribution to journalArticleResearchpeer-review

30 Citations (Scopus)

Analysis of disruptions caused by construction field rework on productivity in residential projects

Arashpour, M., Wakefield, R., Blismas, N. & Lee, E. W. M., 1 Feb 2014, In : Journal of Construction Engineering and Management. 140, 2, 12 p., 04013053.

Research output: Contribution to journalArticleResearchpeer-review

16 Citations (Scopus)

Framework for improving workflow stability: deployment of optimized capacity buffers in a synchronized construction production

Arashpour, M., Wakefield, R., Blismas, N. & Lee, E. W. M., 1 Dec 2014, In : Canadian Journal of Civil Engineering. 41, 12, p. 995-1004 10 p.

Research output: Contribution to journalArticleResearchpeer-review

2013
15 Citations (Scopus)

A new approach for modelling variability in residential construction projects

Arashpour, M., Wakefield, R., Blismas, N. & Lee, E. W. M., 2013, In : Australasian Journal of Construction Economics and Building. 13, 2, p. 83-92 10 p.

Research output: Contribution to journalArticleResearchpeer-review

Open Access
File
2012
19 Citations (Scopus)

Valuing the contribution of knowledge-oriented workers to projects: A merit based approach in the construction industry

Arashpour, M., Shabanikia, M. & Arashpour, M., 2012, In : Australasian Journal of Construction Economics and Building. 12, 4, p. 1-12 12 p.

Research output: Contribution to journalArticleResearchpeer-review

Open Access
File