Root Cause Analysis of A-Frame Cracking in Caterpillar CAT 793D Haul Trucks Operating Across Thiess Mine Sites
Chitty, G. (Primary Chief Investigator (PCI)), Konstantinidis, S. (Project Manager) & Garnett, S. (Project Manager)
16/03/26 → 31/07/27
Project: Research
-
Structural Monitoring System-SMS for P&H shovels to provide Real-time Feedback to Operators and Operations for ArcelorMittal Mine Site in Canada
Chitty, G. (Primary Chief Investigator (PCI))
13/06/23 → 13/06/25
Project: Research
-
Strain Gauges for Hitachi Hydraulic Excavators (supply, install, commission Structural Monitoring System with Payload) to maximise and predict machine and operator performance
Chitty, G. (Primary Chief Investigator (PCI))
Whitehaven Coal Limited, Tarrawonga Coal Pty Ltd, Daunia Operations Pty Ltd, Vickery Coal Pty Ltd
1/07/22 → 31/07/23
Project: Research